slideshow 1

You are here

04/07 - (Video) First blasting conducted at the Dargues Gold Mine

The blast was designed to occur in only 2 firings to both maximise efficiencies and minimise any impact on the local community.  Both the first stage “pre-split” and the second stage ‘body” (or main) blasts went according to plan with data feedback from our vibration monitoring being well within allowable limits.

First blasting conducted at the Dargues Gold Mine.

See attached video

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer